In just a few hours, a fast-moving residential fire left a gaping hole in the fabric of a central neighborhood near downtown Lowell, Massachusetts. The Victorian townhouses at 102-108 Westford Street were left standing but were deemed uninhabitable. They sat empty until the property was purchased by an enterprising duo
with big dreams.

The way 102-108 Westford was rebuilt was like the fire but in reverse. A huge crane, instead of blasting water at uncontrollable flames, gently picked up and placed 12 modular boxes, reconstructing the homes in just seven hours – about as quickly as the flames had rendered them uninhabitable.

Building Info:

  • Location: Lowell, Massachusetts
  • Building Type: Multifamily
  • # of units: 6
  • # of modules: 12
  • Square footage: 10,838 SF
  • Lot size: 6,200 SF
  • Typology: “Double” Triple Decker

Project Team:

  • Developers: Oaktree Development and Nine Zero Two Development
  • Modular Consultant: GreenStaxx
  • Architect: Bruce Ronayne, Hamilton Architects
  • Modular Manufacturer: RCM Modulaire
  • On-site Construction Manager: Performance Building Company
  • Energy Consultant: A9 Green

Behind the scenes of this striking sight, the development team were fulfilling a different kind of promise. Justin MacFarlane of Nine Zero Two Development was showing that modular construction could be a solution to the housing crisis in dense urban areas where there are restricted options for developing new units. In Lowell, developers are often limited to rehabbing older buildings, such as mills and historic office buildings – a noble but costly endeavor – or finding lot sizes large enough for bigger multifamily buildings, at times entailing breaking down the granular urban fabric that makes New England cities so charming. With this modular “double” Triple Decker, MacFarlane was charting new territory as a developer in Lowell, demonstrating how a modern, industrialized version of New England’s iconic Triple Decker could bring back density and add to the historic sense of place in the neighborhood in a way that is cost-effective and replicable across the city.

Gwen Noyes of GreenStaxx and Oaktree Development had an additional mission: to show how standardized unit designs deliver particular value for modular multifamily projects. A long-time advocate of modular construction, Noyes is very familiar with its promise to shorten construction timelines, improve quality of the built product, and increase predictability of total project costs. But Noyes believes that multifamily developers are missing out on an important lever to make modular projects even more compelling – standardized unit plans. 102-108 Westford was an opportunity to co-develop the property with MacFarlane to show how project costs could be trimmed by using a standardized, modular-ready Triple Decker design.

Developing a Standardized Modern Triple Decker

With the need for an urban infill solution in mind, Noyes had previously designed a prototype for modern, modular Triple Decker that could be easily built in the many small, vacant lots in the Boston area. When a homeowner in Cambridge, MA approached her in 2021 after a fire had consumed the family’s century-old triple decker home, Noyes had her first opportunity to apply and test the prototype at 159 Allston Street.

The GreenStaxx original Triple Decker contains an ADA-accessible 2 bedroom unit on the ground floor and 3 bedroom units on the second and third floors. It features a connected kitchen, living and dining area, tall ceilings, thoughtfully placed storage in the hallway and bedrooms, and simple but high-quality finishes and fixtures. The floor plan layout is a modern take on the historic Triple Decker layout, with contemporary updates including less space taken up by hallways, the addition of a second bathroom, more storage, an open floor plan and large windows.

With the homeowner’s desire for the most environmentally responsible building possible, the prototype as applied to Allston Street was built to Passive House standards with rooftop solar and EV charging in the driveway. To meet Passive House requirements for this project, the architects at Bruce Ronayne Hamilton Architects made some minor modifications to GreenStaxx’s prototypical layout, including narrowing the original window sizes to increase energy efficiency. Thus, the first set of full-fledged construction drawings and specification for the GreenStaxx’s original Triple Decker reflected stringent Passive House design standards.

The previous building at 102-108 Westford Street (photo credit: Google Maps)

The original Passive House single Triple Decker at 159 Allston Street (photo credit: Gwen Noyes)

Related Listening:
New Ideas for Energy-Efficient Modular Affordable Housing w/ GreenStaxx

What if affordable multifamily housing could be built more efficiently and with less neighborhood disruption? Gwen Noyes, vice president and COO of GreenStaxx, draws on her wealth of experience in architecture and urban development—and her deep New England roots—as she discusses GreenStaxx's energy-efficient modular housing models. You'll hear firsthand about successful prototypes, like GreenStaxx's triple-deckers in Cambridge and Lowell, that promise to streamline construction and reduce costs.

Listen to more podcasts here.

Customizing Standardized Units for the Next Site

In adapting the original, single Passive House Triple Decker to the site on Westford Street, Noyes and MacFarlane faced a different set of site constraints and market requirements. Yet they were able to recycle the construction documents from Allston Street to a surprising degree, despite some customizations.

To take advantage of a larger site, the team doubled the building size by mirroring the original single Triple Decker along its long edge, creating a duplicate Triple Decker separated by a marriage wall. The implication of this was that an extra bedroom window, originally on the long side wall, was removed and the bathroom against the marriage wall lost a window. Additionally, the team decided to forgo Passive House certification and instead go for the opt-in Massachusetts Stretch energy code, which impacted the HVAC design. For Westford Street, the team also reorganized the closet space and kitchen sink location to increase the living/dining area. In the grand scheme, the unit designs for Westford Street were nearly identical to the ones at Allston Street and the minor changes took the architecture team at BRHA very little time to implement at the schematic level.

The more significant design work involved adapting the rest of the building to the Westford site topography and neighborhood. Most existing triple deckers, including the prior one on Allston Street, have a basement that can conveniently house the advanced electrical panels and sprinkler systems that are needed for an energy-efficient and space-efficient triple decker redo. However, 102-108 Westford sits atop a ledge and the previous building had no basement. To avoid a deep excavation, the team decided on a crawl space instead as the building foundation, which meant tweaking the original entryway vestibule design to accommodate small closets for the panels and sprinkler system. For the building cladding, at the request of Lowell city officials to match the character of the neighborhood, BRHA designed a look to elicit traditional New England, departing from Allston Street’s more modern facade.

In sum, about 75% of the final building plans were repeated between Allston Street and Westford Street, resulting in significant time savings for the architects compared with designing a building without standardized unit plans as the starting point. The modular units were nearly identical to the earlier versions at Allston Street, with the majority of architectural and engineering work done for the foundations and building exterior.

However, BRHA documented further time savings when it came to managing the submittals and requests for information from the modular manufacturer. Even though Westford Street engaged a different modular manufacturer, RCM, than Allston Street, many of the same clarifying questions from RCM had already been addressed and the architects could speedily turn answers around. Had both projects used the same modular manufacturer in addition to very similar building designs, this part of the process would have been even more expeditious. BRHA estimates that around 40-50% of project design fees can be saved by applying standardized unit designs to new projects.

The Big Picture for Standardized, Modular Design

For MacFarlane, for whom Westford Street was a first foray into modular as an independent developer, experiencing the efficiencies in replicating a standardized design only compounded the other benefits he expected from modular construction, like a compressed project timeline and more predictable construction costs. The experience provoked a shift in perspective in how to approach small-scale multifamily projects in a historic, dense city like Lowell. MacFarlane’s exclusive focus is now on finding urban infill sites that are well-suited for replicating Westford Street’s double Triple Decker, with even fewer design modifications. He believes that this approach will put more units on the market faster and more cost-effectively than choosing a site and figuring out what to build next.

This strategy shift points to how even a small breakthrough in the industrialized construction process can help address big picture challenges for our industry. In this case, leveraging standardized unit designs across different projects means that smaller, local developers can harness the principles of scale and repetition on small projects to compete on a more even footing with larger development companies. It also empowers them to deliver the kind of dense, relatively affordable housing that many cities and towns desire but struggle to incentivize private builders to develop.

More from Modular Advantage

How Rebel Concept Harnesses AI as a Design Tool to Improve the DFMA Process

“The complexity of projects and the size of project are so large, and the technology is so complicated that AI would do it so much faster than we are,” says Kris Droszcz, CEO at Rebel Concept. “Everybody’s struggling to control the manufacturing processes according to the design. And I think that’s what AI will do.”

One Answer from AI Can Provide Innumerable Opportunities, says Stack Modular’s Jim Dunn

The Stack AI Engine is not fully functional yet, but it offers an unlimited number of productivity benefits. Currently, the company is using AI for cost estimates, most recently for a project out in California.

GrayWolf: Building the Future of Modular Data Centers to Power the AI Revolution

The growth of artificial intelligence (AI) and cloud-based applications has created an urgent need for data centers capable of managing massive amounts of data. As businesses across industries increasingly rely on digital infrastructure to power their AI tools, the demand for data centers has skyrocketed.

Artificial Intelligence: Yes, it is a Construction Game-Changer

Much like other sectors of the economy, AI is reshaping construction, revolutionizing how projects are planned and executed across the country. While it is obvious that AI cannot do certain things by itself, like laying bricks, paving roads, or shingling roofs, its impact stands to be both massive and positive.

The Potential and Possibilities of AI for Offsite

AI is everywhere. Many industries have incorporated AI into business as usual with new organizational structures and new dependencies to be more efficient and to automate repetitive tasks. Offsite construction will not be immune to AI’s ubiquity. The technology offers unique benefits to the offsite building process.

Moving from AI Hype to an AI Advantage

Learning about AI will help you see past the overinflated hype and identify the opportunities specific to your own business. Learning about AI is like peeling an onion – each layer reveals something new, and occasionally it might make your eyes water. But in the end, you’ll have all the ingredients you need to cook up some real innovation in your organization.

The Blueprint for Smart and Ethical AI Integration in Your Business

The journey toward smart and ethical AI integration involves crafting a strategic vision that aligns AI’s transformative potential with your organizational goals. True success with AI is measured by its capacity to enhance human capabilities, foster sustainable growth, and generate value for all stakeholders while actively avoiding ethical pitfalls and harmful risks.

Five Factors for Success When Shifting Your Business to Modular

As labor, competitive and cost factors push more contractors and developers to embrace the opportunity to go modular as a first choice and not a last resort, it’s become clear that adopting this new model requires more than just a willingness to make it happen. Here are five factors to consider as your company moves to a modular construction model:

UniCool-Edge: Optimized Cooling Solutions for Modular and Edge Data Centers

In an industry where efficiency, scalability, and security are crucial, the UniCool-Edge™ system is a revolutionary solution for modular data center manufacturers. By offering external mounting for maximum space utilization, energy-efficient cooling, and pre-commissioned reliability, UniCool-Edge helps manufacturers stay ahead in the rapidly evolving AI-driven data center market. As edge data centers continue to expand, solutions like UniCool-Edge will play a vital role in supporting the next generation of modular data centers and their data center infrastructure.

Building Skills in a Virtual World: Immersive Training for the Modern Workforce

As both the hardware and software for developing and deploying XR applications continue to become more affordable, the investment in this technology as a training tool is increasingly appealing. XR also offers several other benefits, including performing potentially hazardous tasks in a safe environment and acquiring new skills without the immediate need for physical materials.