One Federal Code for Modular Construction: What It Could Mean for the Industry

Tom Hardiman, CAE

About the author: Tom Hardiman is the executive director of the Modular Building Institute.

Recently I was asked what it would take to grow the modular construction industry to 10% or even 15% of all new construction starts. Let’s start with this – we’re getting there! Seven years ago, volumetric modular construction accounted for 2.14% of the value of all new construction starts in North America (excluding single family). For the year-end 2022, MBI has calculated that figure at 6.03% - nearly triple the market share from 2015. This figure does not include single family modular homes, nor HUD Code, panelized, or tiny homes.

NAHB data puts the number of SF modular homes in the U.S. at around 10,000 annually.  Our calculations in 2021 had the number a little higher but was based on less data, so let’s go with the NAHB figure. Including single family modular residential (estimated at around $3 billion annually) the total modular construction industry in North America checks in around $20 billion annually.

Barriers to Greater Adoption of Modular Construction

I’ve said this often – everything about the construction industry was written from the assumption that the building would be constructed in a “conventional” manner (i.e., on site). And each of these aspects represents a potential barrier to growth. A modular construction project presents different risk characteristics than a traditional project. And for many people, understanding and mitigating these differences is a barrier in and of itself.

Let’s discuss a few of these barriers.

Procurement

Design-bid-build (DBB) is the most widely used project delivery method in the United States, according to the Lean Construction Institute of America. Under this method, an owner contracts separately with a designer, who provides complete design documents, and a contractor, who provides the most attractive price bid to execute that design. The modular manufacturer is too far removed from the design and decision-making process with DBB projects.  A move towards more Design Build projects and Integrated Project Delivery is more conducive to modular participation.

Contracts

The two most commonly used set of construction document templates come from AIA Docs and Consensus Docs.  Until recently, none of these templates addressed the unique circumstances and risk profile associated with modular projects. Over the past three years, MBI worked with Consensus Docs to develop two new “prefabrication” contract templates – the first of their kind.

Financing

The construction cash flow profile for a modular project is perhaps the biggest difference between onsite and offsite. Six years ago, the Canadian Mortgage Housing Corp along with Fannie Mae were reluctant or outright refused to underwrite loans for modular multifamily projects due to a lack of understanding of this difference. Modular projects typically require more cash up front as the manufacturer (often acting as a “super sub-contractor”) must acquire ALL the materials needed to get the building under roof, including paint, carpeting, and fixtures. While construction begins at the factory, onsite work progresses at its typical rate.

Lenders often issue draws based on a percentage of completion and that is often based on what they see on site.  Some lenders feel uncomfortable extending more money with a majority of work in the factory. Securing the loan during prefabrication was also cited as a concern. It should not fall to the modular manufacturer to carry the costs of materials well into a project’s completion. Led by MBI’s Government Affairs team, numerous calls and meetings were held with both CMHC and Fannie Mae to help them understand and ultimately overcome these concerns.

The History of MBI's Partnership with CHMC

  • In 2018, the Canada Modular Housing Corporation (CMHC) did not finance any modular projects.
  • MBI's Government Affairs Director, Jon Hannah-Spacagna, worked with then-CEO, Evan Siddal, to remove that barrier and CMHC agreed to finance commercial and single-family modular projects.
  • In 2020, CMHC contacted MBI to assist with their launch of the Rapid Housing Initiative (RHI). This initiative committed $1.7 billion to finance affordable housing projects across Canada using only modular construction and to be completed in 24 months.
  • The RHI program received so may quality requests, CMHC increased their funding to $3.2 billion to finance all the requests they received. The result was 10,000 housing units built in 24 months.
  • In 2022, CMHC announced a third round of funding for the RHI program, which included an additional $1.5 billion, beginning in 2023.
  • Also in 2022, Scotiabank and Bank of Montreal partnered with CMHC and announced their commitment of $10 billion and $12 billion respectively, to support affordable housing development over the next 10 years.
  • Jon Hannah-Spacagna is working closely with both banks' leadership teams to help them craft their dispersant criteria on how these funds will be utilized. Both are still finalizing those plans.

Building Codes

I’m no huge fan of the current building code development process. If you have ever attended a code development hearing, you know it can be a long, grueling, survivor series, going for 12+ hours a day for more than a week! As a country, we have moved from three large regional codes to one national “model” code (collectively the I-Codes). While not perfect, it does provide a consistent base for all states to work from. The challenge for our industry is again, it was written for an in-situ world. The word “modular” appears nowhere in the building codes.

MBI has been successful in adding more modular friendly language to the IBC over the years, but there is a lot of work remaining. We were unsuccessful in getting our own ICC/MBI standards adopted and referenced in the last cycle of the IBC development. (Yes, the ICC denied the adoption of its own standard!). That was a big disappointment and a setback but not the final outcome. Based largely on this decision, the ICC recognized the issue and changed their code development process (moral victory?). MBI has since tried working with each state on the adoption of the standards.

One Code to Rule Them All…?

But none of this is to suggest that our industry would be better off with one federal building code similar to the manufactured housing HUD code. It is difficult enough to educate code officials and end users about the differences between modular and HUD code homes. Pulling modular projects out of the IRC/IBC and creating a new federal code would add significantly to that confusion. In fact, I would contend that, ultimately, modular would be absorbed into the HUD code. To me, one of the biggest threats to the modular industry is for HUD to expand its scope to include modular projects.

MBI has a great working relationship with the ICC and will continue to develop tools and resources for code officials to better understand this industry. Which leads to the next point.

Inspection Process

Modular projects must meet the same local building code requirements as their site-built counterparts – most commonly a version of the state adopted IRC or IBC. Given that significant portions of construction occur at the offsite factory location and building modules arrive on site “closed” (electrical, plumbing installed covered by drywall), there needs to be an inspection process to determine code compliance BEFORE the modules arrive to avoid destructive inspections by the local AHJ on site. Thirty-six states and one Canadian province have administrative programs detailing how the inspection process must work. Fourteen states and the other provinces still rely on local inspections. It is imperative that these local code officials understand how our industry works, so they can better understand how to inspect us.

Zoning/HOAs

While not a huge barrier to modular, we continue to see Home Owners Association (HOA) bylaws or even city zoning ordinances that prohibit “mobile, manufactured, and modular homes.” This stems from decades old misconceptions and misunderstanding of the differences between modular and manufactured homes. I think our country needs to address the zoning restrictions on manufactured housing, but that’s not my fight. I’m certain that the three “C” manufacturers that control 80+% of that industry will address this issue. But it is yet another reason against a federal modular building code, as we would likely get swept into this debate.

Adding to these barriers are:

Industry Standards – Five years ago, the issue was that there were no industry standards. Now there are, but the issue is getting more states to adopt them - specifically ICC/MBI 1200 and 1205. These standards will help make the review and approval process much more uniform, driving down costs.

Industry Capacity – Realistically, there simply are not enough modular factories to reach 15+% yet. But more factories are coming online. Aside from the number of factories, company owners need to invest in their people and processes to improve their efficiency and productivity. This will help increase industry capacity. Investment in the industry preferably, would be by the industry. I’ve seen too many cases of outside equity money flooding into the industry, looking to streamline operations, increase profitability, and make a fat ROI within five years or less.

Lack of Government Support – The Canadian Mortgage Housing Corporation (CMHC) went from avoiding loans for modular projects, to approving them, and ultimately embracing modular to address their housing crisis. CHMC launched its Rapid Housing Initiative and funded it with $1.7 billion. In the first round, projects had to be modular and had to be completed in 12 months.

After receiving an overwhelming number of project applications, CMHC added another $1.5 billion for the second round. They have since dropped the modular requirement for their third round but still require projects to be finalized in a timely manner (a requirement which obviously favors the modular industry).  Several private banks including Scotia Bank, have jumped on board earmarking as much as $22 billion into the housing initiative. One step to fund $1.5 billion in housing has led to nearly $30 billion invested in similar programs.

No such initiative exists in the U.S. Not only is our federal government drowning in its own red tape, but its solution to housing is also to either throw more money at it or worse, implement programs that are counter-productive, such as the recent rule to expand Davis-Bacon (DB) rates to modular factories.

How the U.S. Federal Government Can Actually Help

Step one would be for the U.S. government policies to “do no more harm.” Representatives from MBI will meet with Congressional leaders later this month to discuss the negative impact that DB will have on our industry. And we plan to take legal action against the USDOL when the final rule is published.

Step two is implementing programs and policies that incentivize greater production of affordable housing. It’s not necessary to earmark modular construction specifically. But the feds COULD incentivize shorter schedules, more sustainable practices, and repeatable designs.

If any political leader is looking for a “moonshot” to address affordable housing, consider this:

For one billion dollars (remember, Canada has invested $30 billion already) offer $10 million in federal tax deductions and credits in the form of accelerated/bonus depreciation for machinery, equipment, or property for any factory that opens or expands specifically to build affordable housing units. Limited to 100 companies, this alone might incentivize the employment of 15,000 factory workers, building 40,000 – 50,000 affordable homes annually. Add additional incentives for the hiring of women, minorities, the disabled, and historically underserved populations. Certainly, this alone wouldn’t solve our housing problem, but it’s a good step in the right direction!

There is no single barrier or issue holding our industry back. Likewise, there is no “silver bullet” solution to help us grow. It will require a collective and cumulative effort on the part of everyone in this industry.

I look forward to continuing these conversations as our industry continues to grow.

More from Modular Advantage

How Rebel Concept Harnesses AI as a Design Tool to Improve the DFMA Process

“The complexity of projects and the size of project are so large, and the technology is so complicated that AI would do it so much faster than we are,” says Kris Droszcz, CEO at Rebel Concept. “Everybody’s struggling to control the manufacturing processes according to the design. And I think that’s what AI will do.”

One Answer from AI Can Provide Innumerable Opportunities, says Stack Modular’s Jim Dunn

The Stack AI Engine is not fully functional yet, but it offers an unlimited number of productivity benefits. Currently, the company is using AI for cost estimates, most recently for a project out in California.

GrayWolf: Building the Future of Modular Data Centers to Power the AI Revolution

The growth of artificial intelligence (AI) and cloud-based applications has created an urgent need for data centers capable of managing massive amounts of data. As businesses across industries increasingly rely on digital infrastructure to power their AI tools, the demand for data centers has skyrocketed.

Artificial Intelligence: Yes, it is a Construction Game-Changer

Much like other sectors of the economy, AI is reshaping construction, revolutionizing how projects are planned and executed across the country. While it is obvious that AI cannot do certain things by itself, like laying bricks, paving roads, or shingling roofs, its impact stands to be both massive and positive.

The Potential and Possibilities of AI for Offsite

AI is everywhere. Many industries have incorporated AI into business as usual with new organizational structures and new dependencies to be more efficient and to automate repetitive tasks. Offsite construction will not be immune to AI’s ubiquity. The technology offers unique benefits to the offsite building process.

Moving from AI Hype to an AI Advantage

Learning about AI will help you see past the overinflated hype and identify the opportunities specific to your own business. Learning about AI is like peeling an onion – each layer reveals something new, and occasionally it might make your eyes water. But in the end, you’ll have all the ingredients you need to cook up some real innovation in your organization.

The Blueprint for Smart and Ethical AI Integration in Your Business

The journey toward smart and ethical AI integration involves crafting a strategic vision that aligns AI’s transformative potential with your organizational goals. True success with AI is measured by its capacity to enhance human capabilities, foster sustainable growth, and generate value for all stakeholders while actively avoiding ethical pitfalls and harmful risks.

Five Factors for Success When Shifting Your Business to Modular

As labor, competitive and cost factors push more contractors and developers to embrace the opportunity to go modular as a first choice and not a last resort, it’s become clear that adopting this new model requires more than just a willingness to make it happen. Here are five factors to consider as your company moves to a modular construction model:

UniCool-Edge: Optimized Cooling Solutions for Modular and Edge Data Centers

In an industry where efficiency, scalability, and security are crucial, the UniCool-Edge™ system is a revolutionary solution for modular data center manufacturers. By offering external mounting for maximum space utilization, energy-efficient cooling, and pre-commissioned reliability, UniCool-Edge helps manufacturers stay ahead in the rapidly evolving AI-driven data center market. As edge data centers continue to expand, solutions like UniCool-Edge will play a vital role in supporting the next generation of modular data centers and their data center infrastructure.

Building Skills in a Virtual World: Immersive Training for the Modern Workforce

As both the hardware and software for developing and deploying XR applications continue to become more affordable, the investment in this technology as a training tool is increasingly appealing. XR also offers several other benefits, including performing potentially hazardous tasks in a safe environment and acquiring new skills without the immediate need for physical materials.