Modular Building Institute
Toggle navigation
About MBI
History & Mission
Leadership
Staff
Join
Find a Member
Search Directory
A-Z Member List
Request an Estimate
Resources
Why Modular?
Research Results
Industry Analysis
Awards
Building Codes
Foundations
FAQ
News
Magazine
Podcast
Industry Analysis
Discussion Forum
Spokesperson
Education
Events Calendar
World of Modular
College Course
For Members
Benefits
Industry Seals
Code of Conduct
Sponsorships & Ads
Newsletter Archive
Government Affairs
Advocacy
Jobs
European Council
JOIN
LOG IN
Search
Search
×
It's time to renew!
Deadline January 31.
×
By using this site, you agree to our updated
Privacy Policy
and our
Terms of Use.
Bruce Power Protected Area Office Complex
(Click an image below to see enlargement)
Main Category:
Modular Building Design
Company:
NRB Modular Solutions
Affiliate:
Location:
Tiverton
,
Ontario
Building Use:
Offices, Cafeteria, Locker Rooms
Gross Size of Project:
75000
Square Feet
Days to complete:
378
Award Criteria
Architectural Excellence
This two storey Admin building is the central area from which the Bruce Nuclear restart program will be operated over the next two decades. The PAOC (Protected Area Office Complex) provides a large open area with efficient work cubicles laid out to accommodate 1200 new staff members on the upper level, and has the supporting locker rooms, shower rooms, meeting spaces, electrical and mechanical rooms and a lunchroom/cafeteria below. The interior is finished with drywall painted, carpet tiles and a combination of ceramic and VCT flooring. The exterior features a tower entrance way and is finished in a combination of architectural aluminum panels and prefinished corrugated steel cladding to provide a high durability/low maintenance exterior. The PAOC is located next to the powerhouse building and is constructed using a design conducive to long term structural integrity and resilience. Many of the systems including fire alarm/suppression, meet stringent nuclear plant design standards.
Technical Innovation & Sustainability
The building is fabricated with steel and pre-poured concrete floors, of a non-combustible and fire rated design. Due to the high level of design sophistication required for this building, it was constructed using NRB’s unique “build together” process. Structural seismic design standards required a significant amount of bracing laterally and between the floors. The building was placed in the protected area of the nuclear plant facility, and partially over a series of underground piping that could not be disturbed by a foundation system. To accommodate this condition, the building was designed with an upper floor bridge to span the affected grade area below and this area then became a drive-through space with automatic overhead doors installed at each end to prevent a wind tunnel effect.
Cost Effectiveness
The Bruce Power PAOC facility adopted a design-build project delivery method as a means of accelerating and integrating the design and construction process, while minimizing the on-site time and activity. Building on a nuclear power plant site with its high-level security measures and extensive safety protocols is a very intensive and lengthy process, and so the plan of creating the new complex off site in a controlled environment was the ideal solution, saving the company both time and money.